As a Brush With Kindness/Critical Repair project, we replaced railings, spindles and lattice on a side deck and demolished and rebuilt a front porch with new framework, floor, railings, lattice and steps.
As a Brush With Kindness/Critical Repair project, we replaced railings, spindles and lattice on a side deck and demolished and rebuilt a front porch with new framework, floor, railings, lattice and steps.
As a Brush with Kindness/Critical Repair project, we added an access ramp coming off an existing deck, moving and repair the existing deck steps. We also repaired deck railings and added spindles to the deck as well as to the steps and the new access ramp.
As a veterans repair project, we replaced a rotted sill, rebuilt a short exterior wall and reinstalled the exterior door and siding. We also replaced a broken bulkhead door and replaced vinyl siding along the lower front walls of the house.
Our construction crew has completed the Brooklyn Street deck project with new vinyl siding installed on the adjoining walls.
Winter weather permitting, construction volunteers have been building a new deck after removing a mudroom and rotted stairs. New siding behind the deck will follow.
Project type: A Brush with Kindness Construction start date: December 2025 Status: Ongoing We are demolishing a rear porch on a home and replacing it with a new deck.
Project type: Veterans Home Repair Program Construction start date: November 2025 Construction completion date: December 2025 Status: Completed/Occupied We constructed a handicapped ramp in Williamstown, MA. We also poured a concrete landing for the ramp and installed a new doorway.